Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Dec 17, 2022     Windshield final trim and polish; Glareshield scuff & prime - (4.2 hours)       Category: Windshield
1. Trimmed back the protective plastic on the windshield and taped it down with clear packing tape to prevent it from getting scratched.

2. Repetitively fitted and sanded the lower edge of the windshield until it fit pretty well, then did the same to the aft, vertical edge to get a consistent gap from the canopy edge.

3. Sanded and polished the edges to remove all nicks. Scraped the edges with a plexiglass edge scraper to round off the edges. There's one area that isn't perfect, but it will be covered by a fairing, so it should be good to go.

4. Masked off the top skin where the leather glareshield cover will eventually go. Roughed up the entire area with 100-grit sandpaper, then cleaned it thoroughly. Primed it with self-etching primer.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.